Saturday, March 21, 2020

Insulation Prep

We are in the process of attaching framing to the walls. This was done so that we would have a way of attaching the insulation to the walls. We did this on the outside walls only because we will be taking out the metal pieces between each box to open up the space.








Peek-a-boo, I see you!! Aaron was on the outside getting ready to attach the framing. I was looking through the corner where the two sections meet.